A roof at last…
Well, the roof finally went on over the last couple of days. There is still some work to do on it, but we are (nearly!) dry.
The first picture today is the dance studio - Last posting, it was a pool. Now the floor is still damp, but the water has gone and the windows and roof are in evidence. Obviously, once the ceiling and wall coverings are in, you wont see the beams, etc.

Staying upstairs, we now turn round and look along the landing from the door of the dance studio.
On the left is the stairwell and beside that you can see the beginning of the wall which will have a large glass section so you can look out of our huge new feature window! The entrance to the lift will be on the right behind Sarah.

Now we move along to the office and meeting room…

Back downstairs now and stop at the bottom to look back up…

Finally, we are in the lounge and you can (just) see the workmen installing the framework for the suspended ceiling.
This was taken at about 4 pm on a Saturday afternoon - hope you’re impressed!

News