30th October
October 30th, 2007
Most of the progress in the past 2 weeks has been made in the bowels of the new building so the appearance of the exterior has not changed very much since the last report and will not do so until the reinforced concrete floor beams for the upper floors are craned into position during w/c 19th November (fingers crossed). The photo below, taken on 30th October, shows the preparations for the stairs from the ground floor to the costume store on the lower ground floor level. They are to be cast within the next few days.